Prague is facing a major tram lockout. Twenty lines will change route for two months

--

As soon as the tram between Hradanská and Strossmayer namst is ready for operation after two weeks of drilling by train, it is again restricted.

The two-way train starting on Monday, April 29, will affect not only the tram lines in the center, but also in the northern part of Prague.

The transport company of the capital city of Prague must repair the tram line in Dldn and Havlkov streets. The track is not in good condition and needs total reconstruction. Due to the current situation on the Libesky Bridge, the changes will affect a large number of tram lines throughout the northeast of Prague, the company explained in a post on Facebook.

the right-of-way will also be affected by the line serving around the Libeski bridge.

Repair of the tram line in Dldn and Havlkov streets will affect traffic in the center and northeast of Prague (April 24, 2024)

The changes will affect daily tram lines 1, 3, 6, 7, 12, 14, 15, 24, 25, 26 and 27, non lines 91, 92, 94 and 96, as well as bus lines 207, 905, 907, 908, 909 and 911. Some of them will drive on a diversion, others on the route of ek peslovn. the rights of the route will also affect the historical tram line slo 42.

Daily lines 1, 7, 12, 15, 24 and 25 and non-tram lines will run on modified routes. The rest will be touched during their journey.

The tram went down

    • Line slo 3 in the direction of Modan it will go from the stop Jindisk to the stop Senovn mnstand the pot will continue as a single line 26 death of Ndra Hostiva.
    • Line 6 in the direction from Kubnskho nmst will go to Karlovy Vary, from where it will continue as a slo line 14 smr Spoilov.
    • Line slo 14 in the direction of Spoilov, it will be shortened to a stop Karlovo nmstwill run as a slo line 6 to the Kubnsk nmst.
    • Line slo 26 in the direction of Ndro Hostiva, it will go from the stop Main fool to the stop Senovn mnstthe pot will continue as a single line 3 dog stop Jindisk smr Sdlit Modany.

The company will thus introduce tram lines 30, 31, 34 and 90, substitute bus service X25 and X94, and thus the final stops. The Masarykovo ndra stop will be near the intersection of Na Po and Havlkova streets, the Senovn namst stop will be built at the Dldn street intersection, and the Vltavsk stop will be on the Hlvkova most bridge.

Repair of the tram line in Dldn and Havlkov streets will affect traffic in the center and northeast of Prague (April 24, 2024)

In addition to the tram, bus lines 207, 905, 907, 908, 909 and 911 will also stop at the Masarykovo ndra stop.

Passengers can find detailed information on the website of the transport company.

The article is in Czech

Tags: Prague facing major tram lockout Twenty lines change route months

-

NEXT Ballet stars and choirs will perform in the Pilsen theater